View Enquiry: BE 2014-2002-024


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
14-Nov-2014 at 11:47:51 AM
Type
Other
Subject
Bridge Aesthetics
Enquiry
Section 1.16.3.3.6 part q) requires that the Design-Builder submit “A description and elevation drawing showing the proposed aesthetic scheme of the bridge.” Section 2.4.8.5 “Aesthetics” requires that bridges be designed in accordance with the Aesthetic Guidelines for Bridges using a “Level 2 – Medium” classification. For a Level 2 Classification the Aesthetic Guidelines for Bridges (2004) states that Ministry Bridge Aesthetic Evaluation Group (MBAEG) approval is optional at the discretion of the Ministry Project Manager. In addition, p. 1-4 of the Guidelines states that the requirements are not binding and “should be considered flexible, not rigid”. Based on the requirements above there are no specific aesthetic treatments for the bridges on this Project. If this statement is correct, please clarify if a separate drawing is required showing a proposed aesthetic scheme. Please also confirm if any MBAEG approvals are required after Project Award.

Response Details
Response Status
Completed
Response Date
20-Nov-2014 at 02:20:38 PM
Response
The bridges shall be designed in accordance with the Aesthetic Guidelines for Bridges using a “Level 2 –Medium” classification as per the RFP requirements. The Design Builder is required to submit a drawing showing the proposed aesthetic features for each bridge. Approval from Ministry Bridge Aesthetic Evaluation Group is not required, but approval is required from Ministry Central Region Engineering Office for each bridge. This will be clarified in RFP - Addendum 2.