View Enquiry: BE 2014-2003-022


Contract Details
Contract Number
2014-2003
Region
Central
Tender Owner
MTO Capital
Location
Highway 9 Replacement of Holland Drainage Canal Bridge - Site #37-030
Highway
9
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Highway 9 Repacement of Holland Drainage Canal Bridge - Site#37-030
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on March 05, 2014.
Contract Dates
Tender Advertise
29-Jan-2014
Tender Opening
28-May-2014 at 01:30:00 PM
TRF Submission Opening
30-Apr-2014
TRF Submission Closing
23-May-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
23-May-2014 at 10:01:34 AM
Type
Other
Subject
Pile Design
Enquiry
The General Arrangement in Appendix D shows a footing on piles driven within steel liners filled with concrete which is all below water level; The Response for BE 018 states: "The liners were proposed as means of isolating the work from creek flow, minimizing channel impacts for environmental purposes, and reducing muck excavation requirements." The response is contradictory to the General Arrangement drawing as the pier footing is below the water level and the design of the pier footing would not allow the use of steel liners. Please clarify if the pier arrangement with a footing shown on General Arrangement drawing in Appendix D is required or is the proponent allowed to alter the design?

Response Details
Response Status
Completed
Response Date
23-May-2014 at 01:56:40 PM
Response
As explained in the SDR, the suggested pier foundation consists of a series of piles driven within a large diameter liner (cofferdam). The liner could serve as a form for the footing. It would extend above water level and be cut off below final grade after construction of the footing. It is the DB contractor’s responsibility to interpret the site conditions and constraints, and to finalize the structure configuration and design.