View Enquiry: BE 2014-2003-021


Contract Details
Contract Number
2014-2003
Region
Central
Tender Owner
MTO Capital
Location
Highway 9 Replacement of Holland Drainage Canal Bridge - Site #37-030
Highway
9
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Highway 9 Repacement of Holland Drainage Canal Bridge - Site#37-030
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on March 05, 2014.
Contract Dates
Tender Advertise
29-Jan-2014
Tender Opening
28-May-2014 at 01:30:00 PM
TRF Submission Opening
30-Apr-2014
TRF Submission Closing
23-May-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
23-May-2014 at 09:47:02 AM
Type
Contract Drawing
Subject
Pile Design
Enquiry
In the "Report for Exception to the CHBDC", the Preliminary General Arrangement Drawing clearly shows a pier arrangement of a pile cap (with no footing) which is contrary to the pile design shown on the "Structural Design Report" Appendix D Drawings (which shows a pier design that includes a footing). Please clarify which design is to be used.

Response Details
Response Status
Completed
Response Date
23-May-2014 at 01:55:34 PM
Response
The “exception” report was prepared early in the design stage to garner approval for a reduced clearance between the HWL and the underside of the bridge. The bridge drawing at that time was preliminary. The pier foundation configuration was changed in the later stages to address some relatively low pile capacities. It is the DB contractor’s responsibility to interpret the site conditions and constraints, and to finalize the structure configuration and design.