View Enquiry: BE 2014-2003-017


Contract Details
Contract Number
2014-2003
Region
Central
Tender Owner
MTO Capital
Location
Highway 9 Replacement of Holland Drainage Canal Bridge - Site #37-030
Highway
9
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Highway 9 Repacement of Holland Drainage Canal Bridge - Site#37-030
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on March 05, 2014.
Contract Dates
Tender Advertise
29-Jan-2014
Tender Opening
28-May-2014 at 01:30:00 PM
TRF Submission Opening
30-Apr-2014
TRF Submission Closing
23-May-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
13-May-2014 at 12:27:43 PM
Type
Other
Subject
Muck Treatment
Enquiry
Referring to the ministry’s response to BE-2014-2003-013, which was issued on May 6, 2014, we have the follow-up questions below: a) For doing additional soils investigation, section 1.6 of the RFP states that we have to submit an application minimum 10 business days before the intended date of investigation. Assuming that we get an approval shortly after we submit, we will still require 1 to 2 weeks to get the locates done. Therefore, would the Ministry consider extending the closing date by at least four (4) weeks so we can carry out the additional soils investigation? b) Alternatively, if an extension of time is not an option, to address the conflicting soils information provided, for bidding purpose, would the Ministry provide the quantity of muck excavation or a sketch showing the limits of the muck excavation ?

Response Details
Response Status
Completed
Response Date
21-May-2014 at 08:01:41 AM
Response
A) Should the proponent wish to conduct field investigation, all requests must be submitted through Traffic Office (MTO RSS) and reference to this project and inform both MTO RSS and the MTO PM with the full detailed description of the work. The Ministry will make every reasonable effort to expedite all requests. The Ministry has given sufficient and appropriate amount of time to all proponents for consideration, therefore, no time extension is given. B) It is the DB contractor’s responsibility to interpret the soil conditions utilizing the available information and/or conducting additional investigations. It’s the DB contractor’s responsibility to determine the quantities for all items. In this regard, it is also up to the proponent to recommend a method to properly deal with the muck that will mutually benefit the Ministry and the proponent.