Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2014-2003-012


Contract Details
Contract Number
2014-2003
Region
Central
Tender Owner
MTO Capital
Location
Highway 9 Replacement of Holland Drainage Canal Bridge - Site #37-030
Highway
9
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Highway 9 Repacement of Holland Drainage Canal Bridge - Site#37-030
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on March 05, 2014.
Contract Dates
Tender Advertise
29-Jan-2014
Tender Opening
28-May-2014 at 01:30:00 PM
TRF Submission Opening
30-Apr-2014
TRF Submission Closing
23-May-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
01-May-2014 at 02:03:52 PM
Type
Other
Subject
Historical Information
Enquiry
The site topography and roadway alignment suggest that the existing bridge may have been built on an alignment off set to the south of a former bridge that was removed. Does the MTO have any historical information related to a bridge at this site that predated the existing bridge? The highway in this area predates the 1950s original construction of the existing bridge. Former timber piles could obstruct installation of new piles and/or excavations and any support systems that are required for muck removal and abutment construction. If no historical information is available, please clearly indicate whether encountering buried timbers will be considered a changed condition.

Response Details
Response Status
Completed
Response Date
06-May-2014 at 01:28:46 PM
Response
Reference Doc# 18 from App. C contains the record information of the structure. The record drawings have some information of the bridge prior to 1966. Buried Timbers are not considered a changed condition.