MINISTRY OF
TRANSPORTATION
R.A.Q.S.
LOGIN
|
REGISTER
Please wait...
An error occurred while executing an action
(Check error messages on the page)
Contracts
Contract Bulletin
Contracts By Region
5 Year Contract History
Qualification Forms, Guides & Procedures
Construction Documents
What's New in RAQS
Road Talk
Engineering Service Providers
RAQS ESP Portal
Help
Contact Information
User Guides
How to Register as a Contractor
View Enquiry: BE 2014-2003-006
Back To CTF
Contract Details
Contract Number
2014-2003
Region
Central
Tender Owner
MTO Capital
Location
Highway 9 Replacement of Holland Drainage Canal Bridge - Site #37-030
Highway
9
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Highway 9 Repacement of Holland Drainage Canal Bridge - Site#37-030
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on March 05, 2014.
Contract Dates
Tender Advertise
29-Jan-2014
Tender Opening
28-May-2014 at 01:30:00 PM
TRF Submission Opening
30-Apr-2014
TRF Submission Closing
23-May-2014 at 12:00:00 PM
Enquiry Details
Enquiry Date
01-Apr-2014 at 04:52:22 PM
Type
Other
Subject
Future Bridge Widening
Enquiry
The RFP states that bridge design shall include provision for future widening. Is it the ministry’s expectation that the substructures and their foundations be designed and/or constructed for future widening?
Response Details
Response Status
Completed
Response Date
09-Apr-2014 at 11:25:05 AM
Response
Widening of substructures for future use is not part of the assignment. The design of the structure shall be such that future widening, to either one side or both sides, is not precluded.