Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-6057-009


Contract Details
Contract Number
2019-6057
Region
Northwestern
Tender Owner
MTO Capital
Location
Winnipeg River Bridge West Branch (Site No. 41S-0124/B0), Hwy 17A, 5.5 km west of Hwy 658; Winnipeg River Bridge East Branch (Site No. 41S-0125/B0), Hwy 17A, 2.4 km west of Hwy 658; Ritchie Road Overpass (Site No. 41S-0128/B0), Hwy 17A, 2.4 km east of Hwy 658
Highway
17A
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Granular Base, Hot Mix Paving, Structure Rehabilitation
Tender Instructions
Contract Dates
Tender Advertise
16-Oct-2019
Tender Opening
20-Nov-2019 at 01:30:00 PM
TRF Submission Opening
23-Oct-2019
TRF Submission Closing
15-Nov-2019 at 12:00:00 PM

Enquiry Details
Enquiry Date
05-Nov-2019 at 06:18:37 PM
Type
Special Conditions
Subject
Deck Joint Assemblies Installation
Enquiry
Special Provision 920F03 reads on Table-1 that the method of joint installation shall be after asphalt paving. Drawing sheet-51, the expansion joint installation after paving is crossed out and the detail for expansion joint installation before paving is shown. Please clarify which method to follow.

Response Details
Response Status
Completed
Response Date
07-Nov-2019 at 08:57:46 AM
Response
The expansion joints will be installed prior to asphalt paving as indicated in the Contract Drawings. Table 1 in SP 920F03 will be revised in Addendum #1.