Contract Description
Structure Rehabilitation
Tender Instructions
Contract Dates
Tender Advertise
01-May-2013
Tender Opening
13-Jun-2013 at 01:30:00 PM
TRF Submission Opening
16-May-2013
TRF Submission Closing
07-Jun-2013 at 12:00:00 PM

Enquiry Details
Enquiry Date
30-May-2013 at 02:27:32 PM
Type
Other
Subject
Jacking of Superstructure
Enquiry
Please clarify the following: a) What is a reason of bridge jacking if a new bridge is to be built? b) On sheet 37 it says that after bearings and structural steel are installed "jack piers upwards by 250 mm", and after precast pales are installed "jack piers downwards by 250 mm". Is not 250 mm jacking upwards and downwards going to break structural steel and concrete panels? And what is going to happen with abutments if we jack piers upwards 250 mm? c) Are the existing abutments footings capable of carrying jacking loads indicated on the drawings?

Response Details
Response Status
Completed
Response Date
12-Jun-2013 at 01:05:44 PM
Response
a: The jacking is integral to the behavior of the new bridge. b: The jacking limits specified are as required to achieve the intended affect and are not excessive. c: Yes