Location
FROM 1.4km NORTH OF BOWEN RD. INTERCHANGE SOUTHERLY TO GILMORE RD. INTERCHANGE / SITE No. 34-129/1 & 2, SITE No. 34-454C, AND SITE No. 34-455C
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
GRADING, DRAINAGE, GRANULAR BASE, PAVING, ELECTRICAL, STRUCTURAL, AND ATMS LENGTH: 5.6 km
Tender Instructions
Contract Dates
Tender Advertise
10-Apr-2019
Tender Opening
18-Jun-2019 at 03:00:00 PM
TRF Submission Opening
21-May-2019
TRF Submission Closing
14-Jun-2019 at 12:00:00 PM

Enquiry Details
Enquiry Date
03-Jun-2019 at 05:39:14 PM
Type
Contract Drawing
Subject
RSS Wall Soil Reinforcement Length
Enquiry
In drawing 194A NBL Retaining Wall, Note #2 states "Minimum RSS wall reinforcing strip length required against global instability: North Abutment - Stepped Wall: 2.5H" On drawing 179A the walls are shown as back to back. This cannot be achieved for design or construction as the soil reinforcement will equate to approximately 24m long while the distance between walls is approximately 15m. Please clarify.

Response Details
Response Status
Completed
Response Date
10-Jun-2019 at 11:55:40 AM
Response
The height of the wall should be taken as the height from the final ground surface at base of wall to the top of the wall. Where the distance between the walls is less than the calculated minimum RSS wall reinforcing strip length, then the strip length should be equal to the distance between the walls.