From 1.0 km south of Highway 407 ETR northerly to Major Mackenzie Drive; Site No. 37W-0276/B1&B2; Site No. 37W-0277/B1&B2; Site No. 37W-0666/B1&B2; and Site No. 37W-0347/B1&B2
Highway
404
Length
2
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, ATMS and Structural Length: 13.6 Km
Tender Instructions
Contract Dates
Tender Advertise
06-Mar-2019
Tender Opening
28-May-2019 at 03:00:00 PM
TRF Submission Opening
30-Apr-2019
TRF Submission Closing
24-May-2019 at 12:00:00 PM

Enquiry Details
Enquiry Date
09-May-2019 at 04:31:49 PM
Type
Items List
Subject
#549
Enquiry
Volume for this item is equal to volume for item #545, but they are different lengths. As the cross-section for the footing is the same, please clarify the volume of this footing. Please also clarify the length of the footing is to be equal to the length of the retaining wall. The Pond Detail drawings do not show the length of the footing, but the Structural Drawings do.

Response Details
Response Status
Completed
Response Date
16-May-2019 at 10:08:00 AM
Response
Outlet wall quantities for SWM Pond 3 have been corrected in Addendum 3. Yes, the footing is longer than the wall by 450mm from each side. Please refer to drawing sheet #776A. The Contractor shall construct the outlet wall as per the structural drawings.