Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2003-015


Contract Details
Contract Number
2019-2003
Region
Central
Tender Owner
MTO Capital
Location
FROM 1.4km NORTH OF BOWEN RD. INTERCHANGE SOUTHERLY TO GILMORE RD. INTERCHANGE / SITE No. 34-129/1 & 2, SITE No. 34-454C, AND SITE No. 34-455C
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
GRADING, DRAINAGE, GRANULAR BASE, PAVING, ELECTRICAL, STRUCTURAL, AND ATMS LENGTH: 5.6 km
Tender Instructions
Contract Dates
Tender Advertise
10-Apr-2019
Tender Opening
18-Jun-2019 at 03:00:00 PM
TRF Submission Opening
21-May-2019
TRF Submission Closing
14-Jun-2019 at 12:00:00 PM

Enquiry Details
Enquiry Date
08-May-2019 at 11:40:17 AM
Type
Contract Drawing
Subject
Two-stage RSS Wall
Enquiry
Please provide details for required 2-stage walls, including backfill material used between stage 1 and 2. This can affect pricing.

Response Details
Response Status
Completed
Response Date
17-May-2019 at 09:04:51 AM
Response
The details for 2-stage walls, including backfill material used between stage 1 and 2 shall be the responsibility of the Contractor’s design for RSS wall. The 2-stage wall shall be designed to meet the requirements outlined in TAC – July 2017 and tender document. The 2-stage RSS wall shall be designed to accommodate the embankment slope, swale, and wild life fencing (where required) on top of the wall.