Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2002-105


Contract Details
Contract Number
2019-2002
Region
Central
Tender Owner
MTO Capital
Location
From 1.0 km south of Highway 407 ETR northerly to Major Mackenzie Drive; Site No. 37W-0276/B1&B2; Site No. 37W-0277/B1&B2; Site No. 37W-0666/B1&B2; and Site No. 37W-0347/B1&B2
Highway
404
Length
2
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, ATMS and Structural Length: 13.6 Km
Tender Instructions
Contract Dates
Tender Advertise
06-Mar-2019
Tender Opening
28-May-2019 at 03:00:00 PM
TRF Submission Opening
30-Apr-2019
TRF Submission Closing
24-May-2019 at 12:00:00 PM

Enquiry Details
Enquiry Date
03-May-2019 at 11:34:12 AM
Type
Contract Drawing
Subject
Temporary lighting at stage flips
Enquiry
Please confirm if temporary lighting is required at all times even during stage flips? If yes, then please clarify the situation as per the details below and as attached. Please see attached comparison of lighting at between stages. Please notice that existing temp lighting in a given stage has to be removed before flipping onto next stage and subsequently lighting as required for the new stage can only be installed after the traffic is flipped over. So, there will be days when no lighting is available at few locations during flipping between stages. The attached file showcase the conflict in two flip overs, whereas there are similar situations in other stage flips as well.
Attachment(s)

Response Details
Response Status
Completed
Response Date
22-May-2019 at 02:39:20 PM
Response
During the transition from one construction stage to another, all temporary lighting shall be maintained and operational at all times during the hours of darkness.