Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2002-051


Contract Details
Contract Number
2019-2002
Region
Central
Tender Owner
MTO Capital
Location
From 1.0 km south of Highway 407 ETR northerly to Major Mackenzie Drive; Site No. 37W-0276/B1&B2; Site No. 37W-0277/B1&B2; Site No. 37W-0666/B1&B2; and Site No. 37W-0347/B1&B2
Highway
404
Length
2
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, ATMS and Structural Length: 13.6 Km
Tender Instructions
Contract Dates
Tender Advertise
06-Mar-2019
Tender Opening
28-May-2019 at 03:00:00 PM
TRF Submission Opening
30-Apr-2019
TRF Submission Closing
24-May-2019 at 12:00:00 PM

Enquiry Details
Enquiry Date
15-Apr-2019 at 03:46:17 PM
Type
Special Conditions
Subject
Buttonville Airport Constraints
Enquiry
Can the Ministry confirm that the Rouge River Structure has no Operational Constraints with the Buttonville Airport Aviation Requirements.

Response Details
Response Status
Completed
Response Date
09-May-2019 at 12:17:31 PM
Response
It is not anticipated that the construction work at the Rouge River structure will impact the Buttonville Airport Aviation Requirements; however, please see upcoming addendum 2 for further information on the constraints related to Buttonville Airport and the associated runway closure fees.