View Enquiry: BE 2019-2002-030


Contract Details
Contract Number
2019-2002
Region
Central
Tender Owner
MTO Capital
Location
From 1.0 km south of Highway 407 ETR northerly to Major Mackenzie Drive; Site No. 37W-0276/B1&B2; Site No. 37W-0277/B1&B2; Site No. 37W-0666/B1&B2; and Site No. 37W-0347/B1&B2
Highway
404
Length
2
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, ATMS and Structural Length: 13.6 Km
Tender Instructions
Contract Dates
Tender Advertise
06-Mar-2019
Tender Opening
28-May-2019 at 03:00:00 PM
TRF Submission Opening
30-Apr-2019
TRF Submission Closing
24-May-2019 at 12:00:00 PM

Enquiry Details
Enquiry Date
08-Apr-2019 at 03:20:10 PM
Type
Contract Drawing
Subject
Hwy 7 Bridge Drawing 165
Enquiry
Hwy 7 Bridge Rehabilitation work traffic control allows night closure only on page 94 of 475, however Drawing 165 seems allow day time closure at off peak hours, please clarify.

Response Details
Response Status
Completed
Response Date
11-Apr-2019 at 12:47:08 PM
Response
Contract Drawing Sheet 165 peak configuration does not show a work zone. The purpose of this detail is to show the temporary metal fence and the sidewalk configuration during peak hours when the Contractor is not working. All lane closures shall be as specified in the tender documents.