Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2002-018


Contract Details
Contract Number
2019-2002
Region
Central
Tender Owner
MTO Capital
Location
From 1.0 km south of Highway 407 ETR northerly to Major Mackenzie Drive; Site No. 37W-0276/B1&B2; Site No. 37W-0277/B1&B2; Site No. 37W-0666/B1&B2; and Site No. 37W-0347/B1&B2
Highway
404
Length
2
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, ATMS and Structural Length: 13.6 Km
Tender Instructions
Contract Dates
Tender Advertise
06-Mar-2019
Tender Opening
28-May-2019 at 03:00:00 PM
TRF Submission Opening
30-Apr-2019
TRF Submission Closing
24-May-2019 at 12:00:00 PM

Enquiry Details
Enquiry Date
04-Apr-2019 at 10:12:20 AM
Type
Other
Subject
Beaver Creek Bridge Rehabilitation
Enquiry
Will the Ministry please identify the exact model of Bridge Master equipment to be used on the Beaver Creek Bridge Rehabilitation, as no access is to be granted underneath the structure? As the Type B repairs may need to be performed all along the underside of the structure, it is proving extremely difficult to locate a piece of equipment with enough of a horizontal reach to accommodate the potential repairs.

Response Details
Response Status
Completed
Response Date
18-Apr-2019 at 08:21:52 AM
Response
Locally, Almon Equipment Limited has a Bridge Master with a reach of 18m, which will be sufficient to complete the work.